What’s Included with Every Installation
Every Installation Includes the following:
- Haul away and recycle old material and equipment
- Recover refrigerant per EPA requirements
- Nitrogen flush refrigerant line set
- Braze with Nitrogen, prevents internal oxidation that causes refrigerant failures and restrict refrigerant flow
- Charge refrigerant system to manufacture specifications
- New insulated sheet metal supply plenum (attic)
- New insulated sheet metal return plenum (attic)
- New metal secondary drain pan (attic)
- New 1" filter base and new 1" filter (closet/garage)
- Seal plenums to air handler and seal flex duct connections at plenums with mastic duct sealer
- New standard custom elbow or transition (roof)
- New standard custom metal stand (roof)
- New fused electrical disconnect with fuses
- New electrical whip installed with wire and conduit
- New PVC trap, vent & connections
- New condensate water float safety switch
- Condensate line blow out using high pressure nitrogen
- New communication wire connections
- Connect to existing gas lines (gas)
- Connect to existing flue pipe (gas)
- Start up and test equipment to ensure safe and efficient operation
- Property Protection – indoor floor coverings
- Clean work area
- 1 year labor
- Satisfaction guaranteed - Full Refund Policy
- The installing contractor will register the equipment directly with the manufacture

